618-4921-130_TRANSISTOR LONG LEAD
1 U (Sold By Adibuja)
Part Number 618-4921-130 is manufactured by Collins Aerospace. It belongs to the Fixed Wing Avionics category and has a CAGE Code of 13499. This part is widely used in aviation and industrial applications, ensuring high quality and reliability from Collins Aerospace.