618-4921-134_TRANSISTOR LONG LEAD


1 U (Sold By Adibuja)

Part Number 618-4921-134 is manufactured by Collins Aerospace. It belongs to the Fixed Wing Avionics category and has a CAGE Code of 13499. This part is widely used in aviation and industrial applications, ensuring high quality and reliability from Collins Aerospace.